Policy and Charging Control for supporting fixed broadband access networks. Clear description of the referenced document: Relationship with other existing or emerging documents:. Specification withdrawal has failed. Spec Type Title Status Prime grp. Stage 2 BB I: 
| Uploader: | Maukus |
| Date Added: | 22 May 2007 |
| File Size: | 32.16 Mb |
| Operating Systems: | Windows NT/2000/XP/2003/2003/7/8/10 MacOS 10/X |
| Downloads: | 28193 |
| Price: | Free* [*Free Regsitration Required] |
Specification has been successfully withdrawn.
SA 2 Secondary responsible groups: Stage 2 BB I: Correction of Figure 5. Feedback Contact Us Accessibility.
Policy and charging control architecture. History Action date Action Author. Network Improvements for Machine-Type Communications.

Qualifying information is on file at TSB. The degree of stability or maturity of the document: Remarks 0 Creation date Author Remark. Version created with approved Updated with approved CRs at Any explicit references within that referenced document should also be listed: Fixes wrongly implemented NBI Are you sure you want delete specification?
QoS Class Identifier
No records to display. Relationship with other existing or emerging documents: General Packet Radio Service. Committed to connecting the world. Relationship with other existing or emerging documents:.
ITU-T A.5 reference justification
BBF convergence and network based mobility. Updated with approved CRs aft Balazs Bertenyi Nokia Networks. Evolution of policy control and charging. Stage 3 security aspects for MIPv4 Access. Justification for the specific reference:. Current information, if any, about IPR issues:. Update with approved CRs 3gpp T Technical specification TS Initial planned Release: S2b Mobility based on GTP.
Other for any supplementary information:.
Other useful information describing the "Quality" of the document: Current information, if any, about IPR issues: Spec Type Title Status Prime grp. Provisioning of IP-based multimedia services.

Комментарии
Отправить комментарий